Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Abdul Nabi, M and El-adaway, I H (2022) Understanding Disputes in Modular Construction Projects: Key Common Causes and Their Associations. Journal of Construction Engineering and Management, 148(01).

Asghari, V and Hsu, S (2022) Upscaling Complex Project-Level Infrastructure Intervention Planning to Network Assets. Journal of Construction Engineering and Management, 148(01).

  • Type: Journal Article
  • Keywords: Asset management; Monte Carlo simulation (MCS); Maintenance optimization; Random forests; Bridge management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002221
  • Abstract:
    Probabilistic and nonlinear models have been used to accurately model various phenomena in asset management systems (AMS). With a commonly adopted framework using Monte Carlo simulation and heuristic algorithms, AMS proposed in the literature aim to maintain the functionality of assets in their life-cycle by optimally allocating limited resources to different intervention actions. However, due to their high computational costs, upscaling complex project-level AMS to a multitude of assets currently is far from practical. To address this gap between the literature and the practice of project-level AMS, this paper presents a new machine learning–based methodology to estimate (near-)optimal intervention timings which usually are derived by optimization algorithms. To illustrate, an ensemble of random forests models was trained on optimal maintenance timings of more than 1.6 million semisynthesized bridges. The trained model yielded optimized maintenance, rehabilitation, and reconstruction (MRR) plans with greater than 95% accuracy on the test set and greater than 89% accuracy on more than 4,600 highway bridges in Indiana, and did so 6 orders of magnitude faster than the conventional framework of complex MRR optimization. Practitioners can adopt the proposed methodology to enhance their decision-making systems, obtain optimal maintenance plans without sacrificing complex and accurate models, and take another step toward sustainability objectives.

Ayinla, K, Cheung, F and Skitmore, M (2022) Process Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production. Journal of Construction Engineering and Management, 148(01).

Criado-Perez, C, Shinkle, G A, Höllerer, M A, Sharma, A, Collins, C, Gardner, N, Hank Haeusler, M and Pan, S (2022) Digital Transformation in the Australian AEC Industry: Prevailing Issues and Prospective Leadership Thinking. Journal of Construction Engineering and Management, 148(01).

Gao, H, Zhong, B, Luo, H and Chen, W (2022) Computational Geometric Approach for BIM Semantic Enrichment to Support Automated Underground Garage Compliance Checking. Journal of Construction Engineering and Management, 148(01).

Gilani, G, Pons, O and de la Fuente, A (2022) Sustainability-Oriented Approach to Assist Decision Makers in Building Facade Management. Journal of Construction Engineering and Management, 148(01).

Hosseinian, S M, Andalib, M and Carmichael, D G (2022) Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters. Journal of Construction Engineering and Management, 148(01).

Hu, Y, Liu, M, Le, Y and Skitmore, M (2022) External Consultant Involvement for Organizational Capability Building in Complex Construction Projects: A Perspective from Interorganizational Learning Process. Journal of Construction Engineering and Management, 148(01).

Li, Y and Chen, J (2022) Computer Vision–Based Counting Model for Dense Steel Pipe on Construction Sites. Journal of Construction Engineering and Management, 148(01).

Lin, C, Chih, Y and Tsay, Y (2022) Determinants of the Adoption of Green Building Simulation Technologies in Architectural Design Practices in Taiwan. Journal of Construction Engineering and Management, 148(01).

Ma, Q, Li, S and Cheung, S O (2022) Unveiling Embedded Risks in Integrated Project Delivery. Journal of Construction Engineering and Management, 148(01).

Mustaffa, N K (2022) Alternative Configurations of Earthmoving Loading Practices toward Emissions Reduction. Journal of Construction Engineering and Management, 148(01).

Pérez, D, Lagos, C and Fernando Alarcón, L (2022) Key Last Planner System Metrics to Assess Project Performance in High-Rise Building and Industrial Construction Projects. Journal of Construction Engineering and Management, 148(01).

Shrestha, K and Shrestha, P P (2022) Framework to Implement Performance-Based Contracting for Chip-Seal Road Maintenance. Journal of Construction Engineering and Management, 148(01).

Vithanage, S C, Sing, M C P, Davis, P and Newaz, M T (2022) Assessing the Off-Site Manufacturing Workers’ Influence on Safety Performance: A Bayesian Network Approach. Journal of Construction Engineering and Management, 148(01).

Ye, M, Lu, W and Xue, F (2022) Impact of Institutional Distance on Environmental and Social Practices in Host Countries: Evidence from International Construction Companies. Journal of Construction Engineering and Management, 148(01).

Yevu, S K, Yu, A T W, Nani, G, Darko, A and Tetteh, M O (2022) Electronic Procurement Systems Adoption in Construction Procurement: A Global Survey on the Barriers and Strategies from the Developed and Developing Economies. Journal of Construction Engineering and Management, 148(01).